LaHave River Watershed Aquatic Connectivity Assessment and Restoration Projects
Coastal Action is proposing to continue with aquatic connectivity assessments in the North Branch Sub-watershed of the LaHave, and begin assessments in the West Branch Sub-watershed. There are approximately 50 crossings in the North Branch left to assess (started in 2016) and approximately 200 crossings in the West Branch to be assessed. Several high priority barrier culverts will be selected for remediation in 2017; two culvert restoration projects in the North Branch, two in the West Branch, and four in the Main River Sub-watershed from assessments conducted in previous years.